ACC-DIV-250 · Bill of materials Demo Diverter 250 mm
Xero connected Tue 4 Aug 2026
← Bill of materials

ACC-DIV-250

Make rev B

Diverter 250 mm

Flow diverter head, 250 mm, wear-lined

Levels

1

2 exploded lines

Material

$201

2 leaf lines

Labour

$1,298

11 h at $118.00

Standard cost

$1,499

Rolled up, never typed

List / margin

$2,460

39.0% at list

1 line in this structure are below their reorder point

CON-WIRE-FCAW . The requirements run will tell you which of those actually have to be ordered this week.

Multi-level explosion

Quantity per parent, quantity for one Diverter 250 mm, and the cost each level carries.

Make Buy Subcontract
Lvl Part No. Description Qty / parent Qty / unit UoM Source Supplier / work centre Unit cost Extended Free
0 ACC-DIV-250 Diverter 250 mm 1 1 ea Make Fabrication Bay 2 $1,499 $1,499 2
1 RAW-PL-BIS80-16 Bisalloy 80 Plate 16 mm 28 28 kg Buy Bisalloy Steels $5 $136 3,014
1 CON-WIRE-FCAW Flux-Cored Wire 1.6 mm 4 4 kg Buy Cigweld $16 $66 84

Where the material money goes

Bought and subcontracted content only — $201.40 bought, $0.00 outside operations.

Part No.DescriptionSupplierQtyUnitExtendedShare
RAW-PL-BIS80-16 Bisalloy 80 Plate 16 mm Bisalloy Steels 28 kg $5 $136 67.4%
CON-WIRE-FCAW Flux-Cored Wire 1.6 mm Cigweld 4 kg $16 $66 32.6%

Where used

This part goes into 1 other structure.

Jobs building this

Nothing on the floor for this part right now.