Everything the platform did and everything it noticed. Every mutation anywhere in the build writes a row here — nothing happens silently.
| Time | Entry |
|---|---|
| 4 Aug 2026 | |
| 07:12 | WO-2026-0431 op 50 promised 24 Jul, still out at 19 days against a 12-day lead. The 500RC test date moves if it isn't back this week. |
| 06:58 | Including 2 at zero — the D5 undercarriage and the 2000-series gearbox. Run requirements before raising anything. |
| 3 Aug 2026 | |
| 16:40 | THD25 with two auger heads and eight drill pipes. Waiting on Shane's bore schedule before the mast length is firm. |
| 15:05 | Central Drilling Solutions, S350 well-service unit. Deposit 40%, promised 30 Oct. |
| 11:22 | 84-day lead. This is the binding constraint on WO-2026-0441 and every 1000-series rig behind it. |
| 09:40 | INV-2026-0584 is 57 days overdue Invoicing Pilecorp, $121,880 including GST. Chased twice. Craig to call Sam. |
| 2 Aug 2026 | |
| 14:18 | WO-2026-0408 entered Test & Commission Work order Vibropile 2000THD. Serial mints on build. Ran 62 hours over on hydraulics. |
| 10:02 | 500-series gearbox plus slips and stabilisers. Blake needs it inside a month — his 500THD is down. |
| 1 Aug 2026 | |
| 16:44 | THD300 with pipe handler, commissioning in Perth. $854,900 ex GST. |
| 31 Jul 2026 | |
| 15:30 | BD-L1000THD-0431 built and despatched Work order WO-2026-0389 completed. Serial added to the rig register, warranty runs to 31 Jul 2027. |
| 13:12 | Drillit International spares stock-up — 4 gearboxes, 4 pump kits, 12 subs. |
| 09:05 | THD1000RC with the microtunnelling interface package to Stuart's Rev C spec. |
| 30 Jul 2026 | |
| 11:50 | WO-2026-0432 placed on hold Inventory Kelly bar run short of 219 × 16 tube. On PO-2026-0431, due 12 Sep. |
| 29 Jul 2026 | |
| 16:20 | Frankipile deposit received — $261,624 Invoicing INV-2026-0612 paid, reconciled in Xero as XRO-INV-4471. |
| 28 Jul 2026 | |
| 08:35 | Drillit have been sent the list. Two are OptionX Group machines. |
| 27 Jul 2026 | |
| 14:02 | Total Drilling Services. Gearbox strip, inspect and rebuild. Invoiced on INV-2026-0618. |
| 24 Jul 2026 | |
| 10:10 | Xero connected System Invoices raised here push across on approval. Reconciliation stays in Xero, as agreed. |
| 22 Jul 2026 | |
| 09:15 | 6 lines deferred against the schedule — $148,200 not committed to stock. |