← Quotes
Q-2026-0206
DraftBMD Constructions · Shane Tapsall
Raised 3 Aug 2026 by Bec Naylor · valid to 2 Sep 2026 · lead time 12 weeks · their reference BMD-P-88213
Accept link: /q/q-2026-0206 — Shane can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.
Note: Shane rang Monday. Still waiting on the bore schedule before we firm the mast length.
Total ex GST
$616,240
$61,624.00 GST · $677,864.00 inc
Cost to build
$428,338
Rolled up from the BOMs
Margin
30.5%
$187,902
Lead time quoted
12 wks
Delivery 27 Oct 2026
Lines
Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.
| # | Part No. | Description | Qty | Unit ex GST | Line ex GST | Cost | Margin | Free stock |
|---|---|---|---|---|---|---|---|---|
| 1 | BD-THD25 | Bournedrill THD25 — 25 kNm head · track mount · 7.5 m mast | 1 | $590,000.00 | $590,000.00 | $411,865 | 30.2% | 0 |
| 2 | ACC-BIT-AUG-600 | Auger Head 600 mm — Rock auger head, Bisalloy 80 flighting, replaceable teeth | 2 | $3,880.00 | $7,760.00 | $4,657 | 40.0% | 2 |
| 3 | ACC-DP-114-3M | Drill Pipe 114 mm × 3 m — Seamless 114 × 10, API reg box/pin, heat treated | 8 | $2,310.00 | $18,480.00 | $11,816 | 36.1% | 22 |
| Total ex GST | $616,240.00 | $428,338 | 30.5% | |||||
| GST 10% | $61,624.00 | |||||||
| Total inc GST | $677,864.00 | |||||||