Bournedrill
Bournedrill
Settings Demo The company, the shop, the people and the integrations
Xero connected Tue 4 Aug 2026

System

Settings

Everything that would need to be right before this ran the business. Nothing here is hidden behind a support ticket.

Company

Trading name
OptionX Bournedrill
Legal entity
Bournedrill Pty Ltd
ABN
42 010 559 806 confirm before go-live
Group
OptionX Group
Postal
PO Box 320, Archerfield QLD 4108
Workshop
Archerfield Workshop, Queensland
Phone
+61 7 3275 1311
Sales
sales@bournedrill.com.au
Bank
NAB 084-004 5219 47831
Since
1965

"We put our experience to work for you" — your own line, off your own site.

Financial & costing

Currency
AUD
GST
10%, shown separately on every document
Financial year
1 July – 30 June
Workshop charge-out
$118.00 / hour ex GST
Costing method
Standard cost, rolled up through the BOM
Pricing
List derived from cost at a target margin
Payment terms offered
COD · 14 days · 30 days · 30 & 45 EOM
Requirements horizon
120 days, 10-day buffer
Stock turns target
4 to 6 a year (currently 2.2)

Integrations

What talks to what. Everything marked Roadmap is a phase 2 conversation, not something quietly missing.

  • Xero Connected

    Invoices, credit notes and contacts push across on approval. Reconciliation, bank feeds and the BAS stay in Xero — exactly as agreed on the call.

    Last sync 2026-08-04 09:14 · 18 invoices
  • Ascentis Retiring

    The incumbent. Historical bills of materials and the part master were migrated; nothing writes back to it. It comes off the bill at go-live.

    Read-only during changeover
  • Supplier price files Roadmap

    Automatic cost updates from Bisalloy, InfraBuild and Bohler, so the standard cost moves the day the steel price does.

    Phase 2
  • Shop-floor tablets Roadmap

    Book operations off at the bench instead of at a desk. The routing screens are already built for it.

    Phase 2
  • AI demand forecasting Roadmap

    Today the requirements run is rules-based — explode, net, date, subtract the lead time. Predicting demand from the enquiry pipeline is a phase 2 conversation.

    Phase 2

People & access

15 people across 4 roles. Each role sees its own interface and gets its own training track — no per-seat licence as the team grows.

NameTitleRoleWork centreEmail
SH Stuart Harrison Chief Executive, OptionX Group Management stuart@optionxgroup.com.au
CH Craig Hills General Manager Management craigh@bournedrill.com.au
MW Marcus Whelan Design Engineer Engineering marcusw@bournedrill.com.au
PR Priya Raman Mechanical Engineer Engineering priyar@bournedrill.com.au
JP Janelle Prentice Accounts & Administration Office janellep@bournedrill.com.au
SD Sofia Duarte Purchasing Officer Office sofiad@bournedrill.com.au
BN Bec Naylor Sales & Estimating Office becn@bournedrill.com.au
DK Dale Kirkwood Workshop Supervisor Workshop Assembly Bay dalek@bournedrill.com.au
TN Tom Ngata Fitter & Turner Workshop Assembly Bay tomn@bournedrill.com.au
AY Adem Yildiz Robotic Weld Operator Workshop Robotic Weld Cell ademy@bournedrill.com.au
JF Josh Farrelly Boilermaker Workshop Fabrication Bay 1 joshf@bournedrill.com.au
NP Nathan Poole CNC Machinist Workshop CNC Machining nathanp@bournedrill.com.au
VS Vinnie Sultana Hydraulics Fitter Workshop Hydraulics & Electrical vinnies@bournedrill.com.au
RB Ryan Beattie Boilermaker Workshop Fabrication Bay 2 ryanb@bournedrill.com.au
KM Kade Milanovic Apprentice Fitter (3rd year) Workshop Assembly Bay kadem@bournedrill.com.au

Work centres

Capacity the scheduling board loads against.

Work centreWhat it doesHours / week
Cut & Prep Plasma table, band saws, drill line 76
CNC Machining Horizontal borer, 2 × CNC lathe, VMC 80
Robotic Weld Cell Robotic welding — the 2024 workshop upgrade 76
Fabrication Bay 1 Mast and chassis fabrication 160
Fabrication Bay 2 Sub-assembly and accessory fabrication 120
Assembly Bay Rig build-up, 4 bays 200
Hydraulics & Electrical Hose runs, valve banks, IQAN commissioning 120
Paint Booth Blast and 2-pack, Bournedrill navy 60
Test & Commission Load test, function test, sign-off — mints the serial 76
Subcontract Heat treatment, hard chrome, gear hobbing, laser profiling, powder coat External

OptionX Group

The businesses named on bournedrill.com.au. All three trade with you.

  • Edge Underground

    Contractor of choice for sewer and water pipeline installation

  • Drillit International

    Service and maintenance for drilling, tunnelling and boring machinery

  • Riteline

    Consumables for the tunnelling and drilling industry

Warehouses

  • Archerfield Main Store Archerfield QLD Live
  • Archerfield Workshop WIP Archerfield QLD Live
  • Field & Service Van Stock Mobile QLD Roadmap

Demo state

Demo date Tue 4 Aug 2026. Everything below the line is what a walkthrough has created on top of the seed.

Seeded business

Part numbers
142
Bill-of-materials links
579
Customers · suppliers
24 · 22
Quotes · sales orders
16 · 18
Work orders
38
Purchase orders · invoices
20 · 22
Rigs in the field
32
Stock movements
130

Created during this walkthrough

Quotes moved
0
Sales orders raised
0
Work orders raised
0
Builds run (serials minted)
0
Purchase orders raised
0
Invoices raised
0
Stock lines moved
0
Documents in Sent Items
0

Reset puts everything back to the pristine seed so the walkthrough can be run again cleanly.

Built on Cloudflare. There is no third-party service in the request path — no mail provider, no payment gateway, no external API — so nothing outside this platform can take it down mid-call. Health check at /api/health.