← Quotes
Q-2026-0205
SentTotal Drilling Services · Blake Mowbray
Raised 2 Aug 2026 by Bec Naylor · valid to 23 Aug 2026 · lead time 4 weeks · their reference TDS-2026-31
Accept link: /q/q-2026-0205 — Blake can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.
Note: Blake needs the gearbox inside a month — his 500THD is down.
Total ex GST
$35,900
$3,590.00 GST · $39,490.00 inc
Cost to build
$19,977
Rolled up from the BOMs
Margin
44.4%
$15,923
Lead time quoted
4 wks
Delivery 1 Sep 2026
Lines
Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.
| # | Part No. | Description | Qty | Unit ex GST | Line ex GST | Cost | Margin | Free stock |
|---|---|---|---|---|---|---|---|---|
| 1 | GBX-THD-500 | THD Gearbox — 500 series — 500 series gearbox, sold as a spare | 1 | $20,000.00 | $20,000.00 | $10,925 | 45.4% | 1 |
| 2 | ACC-SLP-219 | Slips 219 mm — Manual slips, 219 mm casing | 2 | $2,150.00 | $4,300.00 | $2,406 | 44.0% | 2 |
| 3 | ACC-STB-250 | Stabiliser 250 mm — Spiral blade stabiliser, hardfaced | 2 | $2,495.00 | $4,990.00 | $2,945 | 41.0% | 1 |
| 4 | BD-PMP-SVC-KIT | Pump Spares & Service Kit — Liners, pistons, valves and seats — duplex 350 | 2 | $3,305.00 | $6,610.00 | $3,700 | 44.0% | 2 |
| Total ex GST | $35,900.00 | $19,977 | 44.4% | |||||
| GST 10% | $3,590.00 | |||||||
| Total inc GST | $39,490.00 | |||||||