← Quotes
Q-2026-0203
SentEdge Underground · Stuart Harrison
Raised 31 Jul 2026 by Craig Hills · valid to 14 Sep 2026 · lead time 20 weeks · their reference EU-MT-09
Accept link: /q/q-2026-0203 — Stuart can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.
Note: Group company. Stuart wants the RC conversion for the Melbourne sewer package.
Total ex GST
$1,032,900
$103,290.00 GST · $1,136,190.00 inc
Cost to build
$631,365
Rolled up from the BOMs
Margin
38.9%
$401,535
Lead time quoted
20 wks
Delivery 22 Dec 2026
Lines
Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.
| # | Part No. | Description | Qty | Unit ex GST | Line ex GST | Cost | Margin | Free stock |
|---|---|---|---|---|---|---|---|---|
| 1 | BD-THD1000RC | Bournedrill THD1000RC — 1000 THD head with RC conversion · 9 m mast | 1 | $965,000.00 | $965,000.00 | $606,588 | 37.1% | 0 |
| 2 | ASM-RC-HEAD | Spare reverse circulation head assembly | 1 | $29,400.00 | $29,400.00 | $8,607 | 70.7% | 0 |
| 3 | — | Microtunnelling interface package — engineered to Edge spec Stuart's spec, Rev C | 1 | $38,500.00 | $38,500.00 | $16,170 | 58.0% | — |
| Total ex GST | $1,032,900.00 | $631,365 | 38.9% | |||||
| GST 10% | $103,290.00 | |||||||
| Total inc GST | $1,136,190.00 | |||||||