Q-2026-0203 Demo Edge Underground · $1,032,900.00 ex GST
Xero connected Tue 4 Aug 2026
← Quotes

Q-2026-0203

Sent

Edge Underground · Stuart Harrison

Raised 31 Jul 2026 by Craig Hills · valid to 14 Sep 2026 · lead time 20 weeks · their reference EU-MT-09

Print / PDF

Accept link: /q/q-2026-0203 — Stuart can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.

Note: Group company. Stuart wants the RC conversion for the Melbourne sewer package.

Total ex GST

$1,032,900

$103,290.00 GST · $1,136,190.00 inc

Cost to build

$631,365

Rolled up from the BOMs

Margin

38.9%

$401,535

Lead time quoted

20 wks

Delivery 22 Dec 2026

Lines

Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.

#Part No.DescriptionQtyUnit ex GSTLine ex GSTCostMarginFree stock
1 BD-THD1000RC Bournedrill THD1000RC — 1000 THD head with RC conversion · 9 m mast 1 $965,000.00 $965,000.00 $606,588 37.1% 0
2 ASM-RC-HEAD Spare reverse circulation head assembly 1 $29,400.00 $29,400.00 $8,607 70.7% 0
3 Microtunnelling interface package — engineered to Edge spec
Stuart's spec, Rev C
1 $38,500.00 $38,500.00 $16,170 58.0%
Total ex GST $1,032,900.00 $631,365 38.9%
GST 10% $103,290.00
Total inc GST $1,136,190.00