ACC-TRI-1200 · Bill of materials Demo Tri-Barrel 1200 mm
Xero connected Tue 4 Aug 2026
← Bill of materials

ACC-TRI-1200

Make rev A

Tri-Barrel 1200 mm

Triple-wall core barrel, 1200 mm

Levels

1

3 exploded lines

Material

$2,013

3 leaf lines

Labour

$4,484

38 h at $118.00

Standard cost

$6,497

Rolled up, never typed

List / margin

$9,845

34.0% at list

2 lines in this structure are below their reorder point

RAW-TUBE-219X16, CON-WIRE-FCAW . The requirements run will tell you which of those actually have to be ordered this week.

Multi-level explosion

Quantity per parent, quantity for one Tri-Barrel 1200 mm, and the cost each level carries.

Make Buy Subcontract
Lvl Part No. Description Qty / parent Qty / unit UoM Source Supplier / work centre Unit cost Extended Free
0 ACC-TRI-1200 Tri-Barrel 1200 mm 1 1 ea Make Fabrication Bay 2 $6,497 $6,497 0
1 RAW-TUBE-219X16 Seamless Tube 219 × 16 4.8 4.8 m Buy Bohler Uddeholm Australia $326 $1,565 12
1 RAW-PL-BIS80-16 Bisalloy 80 Plate 16 mm 62 62 kg Buy Bisalloy Steels $5 $301 3,014
1 CON-WIRE-FCAW Flux-Cored Wire 1.6 mm 9 9 kg Buy Cigweld $16 $148 84

Where the material money goes

Bought and subcontracted content only — $2,013.10 bought, $0.00 outside operations.

Part No.DescriptionSupplierQtyUnitExtendedShare
RAW-TUBE-219X16 Seamless Tube 219 × 16 Bohler Uddeholm Australia 4.8 m $326 $1,565 77.7%
RAW-PL-BIS80-16 Bisalloy 80 Plate 16 mm Bisalloy Steels 62 kg $5 $301 14.9%
CON-WIRE-FCAW Flux-Cored Wire 1.6 mm Cigweld 9 kg $16 $148 7.3%

Where used

Top-level item — it isn't a component of anything else.

Jobs building this

Nothing on the floor for this part right now.