ASM-CTRL-IQAN
MakeControl & Electrical — IQAN
Assembly · drawing BD-CTRL-IQAN rev H · made at Hydraulics & Electrical
On hand
1ea
B-03-1 · Archerfield Workshop WIP
Allocated
1
Committed to jobs
Free
0
Reorder point —
On order
0
35-day lead
Turns
24.0
24 ea a year
Value held
$33,288
$33,287.80 each
Raise now
Needed 4 Aug 2026, and the 35-day lead means it should already have left — expedite by 35 days
Driven by WO-2026-0401 (1 ea by 4 Aug 2026), WO-2026-0396 (1 ea by 4 Aug 2026), WO-2026-0421 (1 ea by 4 Aug 2026), WO-2026-0424 (1 ea by 4 Aug 2026) and 8 more.
Stock movements
Newest first. The balance on the top row is the on-hand figure above — the ledger and the position can't disagree, because one is derived from the other.
| Date | Type | Reference | By | Qty | Balance |
|---|---|---|---|---|---|
| No movements recorded against this part yet. | |||||
Costing
- Material rolled up
- $19,363.80
- Labour (118 h)
- $13,924.00
- Standard cost
- $33,287.80
- Lead time
- 35 days
Where used
Goes into 26 structures.