← Inventory
ASM-PWR-QSB67
MakePower Pack — Cummins QSB6.7
Assembly · drawing BD-PWR-QSB67 rev E · made at Hydraulics & Electrical
On hand
0ea
B-02-2 · Archerfield Workshop WIP
Allocated
0
Committed to jobs
Free
0
Reorder point —
On order
0
63-day lead
Turns
—
19 ea a year
Value held
$0
$88,606.40 each
Raise now
Needed 4 Aug 2026, and the 63-day lead means it should already have left — expedite by 63 days
Driven by WO-2026-0401 (1 ea by 4 Aug 2026), WO-2026-0396 (1 ea by 4 Aug 2026), WO-2026-0436 (1 ea by 23 Sep 2026), WO-2026-0429 (1 ea by 25 Sep 2026) and 1 more.
Stock movements
Newest first. The balance on the top row is the on-hand figure above — the ledger and the position can't disagree, because one is derived from the other.
| Date | Type | Reference | By | Qty | Balance |
|---|---|---|---|---|---|
| No movements recorded against this part yet. | |||||
Costing
- Material rolled up
- $73,266.40
- Labour (130 h)
- $15,340.00
- Standard cost
- $88,606.40
- Lead time
- 63 days
Where used
Goes into 15 structures.