FAB-GUARD-SET
Make Below reorder pointGuarding Set, powder coated
Fabrication · drawing BD-F-GUARD rev C · made at Fabrication Bay 2
On hand
2ea
A-08-3 · Archerfield Main Store
Allocated
1
Committed to jobs
Free
1
Reorder point 2
On order
0
18-day lead
Turns
16.5
33 ea a year
Value held
$12,314
$6,156.75 each
Raise now
Needed 4 Aug 2026, and the 18-day lead means it should already have left — expedite by 18 days
Driven by WO-2026-0401 (1 ea by 4 Aug 2026), WO-2026-0396 (1 ea by 4 Aug 2026), WO-2026-0421 (1 ea by 4 Aug 2026), WO-2026-0424 (1 ea by 4 Aug 2026) and 9 more.
Stock movements
Newest first. The balance on the top row is the on-hand figure above — the ledger and the position can't disagree, because one is derived from the other.
| Date | Type | Reference | By | Qty | Balance |
|---|---|---|---|---|---|
| No movements recorded against this part yet. | |||||
Costing
- Material rolled up
- $1,672.75
- Labour (38 h)
- $4,484.00
- Standard cost
- $6,156.75
- Lead time
- 18 days
Where used
Goes into 28 structures.