← Quotes
Q-2026-0201
SentVibropile (Aust) Pty Ltd · Dean Kowalczyk
Raised 30 Jul 2026 by Bec Naylor · valid to 29 Aug 2026 · lead time 14 weeks · their reference VP-RFQ-2026-118
Accept link: /q/q-2026-0201 — Dean can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.
Note: Dean asked for the 1500 table with a spare kelly set. Competing against a rebuild.
Total ex GST
$952,106
$95,210.64 GST · $1,047,317.04 inc
Cost to build
$648,234
Rolled up from the BOMs
Margin
31.9%
$303,873
Lead time quoted
14 wks
Delivery 10 Nov 2026
Lines
Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.
| # | Part No. | Description | Qty | Unit ex GST | Line ex GST | Cost | Margin | Free stock |
|---|---|---|---|---|---|---|---|---|
| 1 | BD-1500R | Bournedrill 1500R — 1,500 mm table · kelly bar drive · 15 t line pull | 1 | $920,000.00 | $920,000.00 | $625,407 | 32.0% | 0 |
| 2 | MCH-KELLY-BAR-3 | Kelly Bar Section — 3 m | 4 | $4,026.60 | $16,106.40 | $16,106 | 0.0% | 1 |
| 3 | — | Commissioning, Braeside VIC | 1 | $11,800.00 | $11,800.00 | $4,956 | 58.0% | — |
| 4 | — | Freight — Archerfield to Braeside | 1 | $4,200.00 | $4,200.00 | $1,764 | 58.0% | — |
| Total ex GST | $952,106.40 | $648,234 | 31.9% | |||||
| GST 10% | $95,210.64 | |||||||
| Total inc GST | $1,047,317.04 | |||||||