Bournedrill
Bournedrill
ACC-DP-140-6M · Bill of materials Demo Drill Pipe 140 mm × 6 m
Xero connected Tue 4 Aug 2026
← Bill of materials

ACC-DP-140-6M

Make rev B

Drill Pipe 140 mm × 6 m

Seamless 140 × 12, API reg box/pin, heat treated

Levels

1

3 exploded lines

Material

$2,477

3 leaf lines

Labour

$1,003

9 h at $118.00

Standard cost

$3,480

Rolled up, never typed

List / margin

$5,435

36.0% at list

1 line in this structure are below their reorder point

RAW-TUBE-219X16 . The requirements run will tell you which of those actually have to be ordered this week.

Multi-level explosion

Quantity per parent, quantity for one Drill Pipe 140 mm × 6 m, and the cost each level carries.

Make Buy Subcontract
Lvl Part No. Description Qty / parent Qty / unit UoM Source Supplier / work centre Unit cost Extended Free
0 ACC-DP-140-6M Drill Pipe 140 mm × 6 m 1 1 ea Make Fabrication Bay 2 $3,480 $3,480 12
1 RAW-TUBE-219X16 Seamless Tube 219 × 16 6.2 6.2 m Buy Bohler Uddeholm Australia $326 $2,021 12
1 CON-WIRE-ER70S MIG Wire ER70S-6 1.2 mm 3 3 kg Buy Cigweld $12 $35 424
1 SUB-HT-4140 Heat Treatment — 4140, harden & temper 1 1 ea Subcontract Bodycote Australasia $420 $420 0

Where the material money goes

Bought and subcontracted content only — $2,056.60 bought, $420.00 outside operations.

Part No.DescriptionSupplierQtyUnitExtendedShare
RAW-TUBE-219X16 Seamless Tube 219 × 16 Bohler Uddeholm Australia 6.2 m $326 $2,021 81.6%
SUB-HT-4140 Heat Treatment — 4140, harden & temper Bodycote Australasia 1 ea $420 $420 17.0%
CON-WIRE-ER70S MIG Wire ER70S-6 1.2 mm Cigweld 3 kg $12 $35 1.4%

Where used

Top-level item — it isn't a component of anything else.

Jobs building this