Levels
1
4 exploded lines
Material
$3,992
4 leaf lines
Labour
$13,924
118 h at $118.00
Standard cost
$17,916
Rolled up, never typed
Not sold on its own
—
Component of a larger build
1 line in this structure are below their reorder point
RAW-RHS-250X150X9 . The requirements run will tell you which of those actually have to be ordered this week.
Multi-level explosion
Quantity per parent, quantity for one Mast Box Section — 2000, welded, and the cost each level carries.
Make Buy Subcontract
| Lvl | Part No. | Description | Qty / parent | Qty / unit | UoM | Source | Supplier / work centre | Unit cost | Extended | Free |
|---|---|---|---|---|---|---|---|---|---|---|
| 0 | FAB-MST-BOX-2000 | Mast Box Section — 2000, welded | 1 | 1 | ea | Make | Robotic Weld Cell | $17,916 | $17,916 | 0 |
| 1 | RAW-RHS-250X150X9 | RHS 250 × 150 × 9 Grade 350 | 16.8 | 16.8 | m | Buy | InfraBuild Steel Centre | $148 | $2,486 | 46 |
| 1 | RAW-PL-BIS80-16 | Bisalloy 80 Plate 16 mm | 124 | 124 | kg | Buy | Bisalloy Steels | $5 | $601 | 3,014 |
| 1 | CON-WIRE-ER70S | MIG Wire ER70S-6 1.2 mm | 19 | 19 | kg | Buy | Cigweld | $12 | $224 | 424 |
| 1 | SUB-LASER-PL | Laser Profiling — plate nest | 1 | 1 | ea | Subcontract | Laser Cutting Services QLD | $680 | $680 | 0 |
Where the material money goes
Bought and subcontracted content only — $3,312.00 bought, $680.00 outside operations.
| Part No. | Description | Supplier | Qty | Unit | Extended | Share |
|---|---|---|---|---|---|---|
| RAW-RHS-250X150X9 | RHS 250 × 150 × 9 Grade 350 | InfraBuild Steel Centre | 16.8 m | $148 | $2,486 | 62.3% |
| SUB-LASER-PL | Laser Profiling — plate nest | Laser Cutting Services QLD | 1 ea | $680 | $680 | 17.0% |
| RAW-PL-BIS80-16 | Bisalloy 80 Plate 16 mm | Bisalloy Steels | 124 kg | $5 | $601 | 15.1% |
| CON-WIRE-ER70S | MIG Wire ER70S-6 1.2 mm | Cigweld | 19 kg | $12 | $224 | 5.6% |
Where used
This part goes into 1 other structure.
Jobs building this
Nothing on the floor for this part right now.