Levels
1
3 exploded lines
Material
$1,704
3 leaf lines
Labour
$11,328
96 h at $118.00
Standard cost
$13,032
Rolled up, never typed
Not sold on its own
—
Component of a larger build
1 line in this structure are below their reorder point
CON-WIRE-FCAW . The requirements run will tell you which of those actually have to be ordered this week.
Multi-level explosion
Quantity per parent, quantity for one Rotary Table Housing — 1500, and the cost each level carries.
Make Buy Subcontract
| Lvl | Part No. | Description | Qty / parent | Qty / unit | UoM | Source | Supplier / work centre | Unit cost | Extended | Free |
|---|---|---|---|---|---|---|---|---|---|---|
| 0 | FAB-TBL-HOUS-1500 | Rotary Table Housing — 1500 | 1 | 1 | ea | Make | Robotic Weld Cell | $13,032 | $13,032 | 0 |
| 1 | RAW-PL-350-20 | Plate 20 mm Grade 350 | 310 | 310 | kg | Buy | InfraBuild Steel Centre | $2 | $729 | 7,920 |
| 1 | CON-WIRE-FCAW | Flux-Cored Wire 1.6 mm | 18 | 18 | kg | Buy | Cigweld | $16 | $295 | 84 |
| 1 | SUB-LASER-PL | Laser Profiling — plate nest | 1 | 1 | ea | Subcontract | Laser Cutting Services QLD | $680 | $680 | 0 |
Where the material money goes
Bought and subcontracted content only — $1,023.70 bought, $680.00 outside operations.
| Part No. | Description | Supplier | Qty | Unit | Extended | Share |
|---|---|---|---|---|---|---|
| RAW-PL-350-20 | Plate 20 mm Grade 350 | InfraBuild Steel Centre | 310 kg | $2 | $729 | 42.8% |
| SUB-LASER-PL | Laser Profiling — plate nest | Laser Cutting Services QLD | 1 ea | $680 | $680 | 39.9% |
| CON-WIRE-FCAW | Flux-Cored Wire 1.6 mm | Cigweld | 18 kg | $16 | $295 | 17.3% |
Where used
This part goes into 2 other structures.
Jobs building this
Nothing on the floor for this part right now.