Bournedrill
Bournedrill
Q-2026-0193 Demo Coastal Water Bores · $613,790.00 ex GST
Xero connected Tue 4 Aug 2026
← Quotes

Q-2026-0193

Accepted

Coastal Water Bores · Trevor Lindsay

Raised 20 Jul 2026 by Bec Naylor · valid to 10 Aug 2026 · lead time 8 weeks · their reference CWB-0771

Accepted. This became sales order SO-2026-0146 — the same lines, the same costs, the same margins. Nothing was re-keyed to get there.

Total ex GST

$613,790

$61,379.00 GST · $675,169.00 inc

Cost to build

$443,303

Rolled up from the BOMs

Margin

27.8%

$170,487

Lead time quoted

8 wks

Delivery 29 Sep 2026

Lines

Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.

#Part No.DescriptionQtyUnit ex GSTLine ex GSTCostMarginFree stock
1 BD-WO12-60 Bournedrill WO12-60 — 12 t workover unit · 60 ft derrick 1 $575,000.00 $575,000.00 $418,159 27.3% 0
2 ACC-WS-SWIVEL Well Service Swivel — Water swivel, 25 t, 3" bore 1 $6,690.00 $6,690.00 $4,280 36.0% 1
3 ACC-DP-89-1M5 Drill Pipe 89 mm × 1.5 m — Short sub pipe for limited-access work 20 $1,605.00 $32,100.00 $20,864 35.0% 10
Total ex GST $613,790.00 $443,303 27.8%
GST 10% $61,379.00
Total inc GST $675,169.00