← Quotes
Q-2026-0193
AcceptedCoastal Water Bores · Trevor Lindsay
Raised 20 Jul 2026 by Bec Naylor · valid to 10 Aug 2026 · lead time 8 weeks · their reference CWB-0771
Accepted. This became sales order SO-2026-0146 — the same lines, the same costs, the same margins. Nothing was re-keyed to get there.
Total ex GST
$613,790
$61,379.00 GST · $675,169.00 inc
Cost to build
$443,303
Rolled up from the BOMs
Margin
27.8%
$170,487
Lead time quoted
8 wks
Delivery 29 Sep 2026
Lines
Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.
| # | Part No. | Description | Qty | Unit ex GST | Line ex GST | Cost | Margin | Free stock |
|---|---|---|---|---|---|---|---|---|
| 1 | BD-WO12-60 | Bournedrill WO12-60 — 12 t workover unit · 60 ft derrick | 1 | $575,000.00 | $575,000.00 | $418,159 | 27.3% | 0 |
| 2 | ACC-WS-SWIVEL | Well Service Swivel — Water swivel, 25 t, 3" bore | 1 | $6,690.00 | $6,690.00 | $4,280 | 36.0% | 1 |
| 3 | ACC-DP-89-1M5 | Drill Pipe 89 mm × 1.5 m — Short sub pipe for limited-access work | 20 | $1,605.00 | $32,100.00 | $20,864 | 35.0% | 10 |
| Total ex GST | $613,790.00 | $443,303 | 27.8% | |||||
| GST 10% | $61,379.00 | |||||||
| Total inc GST | $675,169.00 | |||||||