← Quotes
Q-2026-0198
SentPiling Contractors Pty Ltd · Grant Mullins
Raised 28 Jul 2026 by Bec Naylor · valid to 27 Aug 2026 · lead time 18 weeks · their reference PC-ENQ-4471
Accept link: /q/q-2026-0198 — Grant can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.
Note: Grant wants it on the Cross River Rail package. Needs a firm delivery week before he'll sign.
Total ex GST
$1,118,570
$111,857.00 GST · $1,230,427.00 inc
Cost to build
$691,468
Rolled up from the BOMs
Margin
38.2%
$427,102
Lead time quoted
18 wks
Delivery 8 Dec 2026
Lines
Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.
| # | Part No. | Description | Qty | Unit ex GST | Line ex GST | Cost | Margin | Free stock |
|---|---|---|---|---|---|---|---|---|
| 1 | BD-2000THD | Bournedrill 2000THD — 20,000 kg pullback · 2000 series head · 12 m mast | 1 | $1,010,000.00 | $1,010,000.00 | $625,058 | 38.1% | 0 |
| 2 | ACC-PH-1000 | Pipe Handler 1000 — Hydraulic pipe handler for 1000-series masts | 1 | $26,000.00 | $26,000.00 | $17,368 | 33.2% | 1 |
| 3 | ACC-DP-140-6M | Drill Pipe 140 mm × 6 m — Seamless 140 × 12, API reg box/pin, heat treated | 12 | $5,435.00 | $65,220.00 | $41,755 | 36.0% | 12 |
| 4 | — | Commissioning and operator training, Wacol 3 days on site | 1 | $14,500.00 | $14,500.00 | $6,090 | 58.0% | — |
| 5 | — | Freight — Archerfield to Wacol | 1 | $2,850.00 | $2,850.00 | $1,197 | 58.0% | — |
| Total ex GST | $1,118,570.00 | $691,468 | 38.2% | |||||
| GST 10% | $111,857.00 | |||||||
| Total inc GST | $1,230,427.00 | |||||||