Bournedrill
Bournedrill
Q-2026-0198 Demo Piling Contractors Pty Ltd · $1,118,570.00 ex GST
Xero connected Tue 4 Aug 2026
← Quotes

Q-2026-0198

Sent

Piling Contractors Pty Ltd · Grant Mullins

Raised 28 Jul 2026 by Bec Naylor · valid to 27 Aug 2026 · lead time 18 weeks · their reference PC-ENQ-4471

Print / PDF

Accept link: /q/q-2026-0198 — Grant can accept from that URL without an account and without an email going anywhere. Everything this build "sends" lands in Sent Items instead.

Note: Grant wants it on the Cross River Rail package. Needs a firm delivery week before he'll sign.

Total ex GST

$1,118,570

$111,857.00 GST · $1,230,427.00 inc

Cost to build

$691,468

Rolled up from the BOMs

Margin

38.2%

$427,102

Lead time quoted

18 wks

Delivery 8 Dec 2026

Lines

Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.

#Part No.DescriptionQtyUnit ex GSTLine ex GSTCostMarginFree stock
1 BD-2000THD Bournedrill 2000THD — 20,000 kg pullback · 2000 series head · 12 m mast 1 $1,010,000.00 $1,010,000.00 $625,058 38.1% 0
2 ACC-PH-1000 Pipe Handler 1000 — Hydraulic pipe handler for 1000-series masts 1 $26,000.00 $26,000.00 $17,368 33.2% 1
3 ACC-DP-140-6M Drill Pipe 140 mm × 6 m — Seamless 140 × 12, API reg box/pin, heat treated 12 $5,435.00 $65,220.00 $41,755 36.0% 12
4 Commissioning and operator training, Wacol
3 days on site
1 $14,500.00 $14,500.00 $6,090 58.0%
5 Freight — Archerfield to Wacol 1 $2,850.00 $2,850.00 $1,197 58.0%
Total ex GST $1,118,570.00 $691,468 38.2%
GST 10% $111,857.00
Total inc GST $1,230,427.00