Bournedrill
Bournedrill
Q-2026-0199 Demo Drillit International · $144,980.00 ex GST
Xero connected Tue 4 Aug 2026
← Quotes

Q-2026-0199

Accepted

Drillit International · Wayne Petersen

Raised 29 Jul 2026 by Craig Hills · valid to 28 Aug 2026 · lead time 6 weeks · their reference DRILLIT-SPARES-2026-08

Accepted. This became sales order SO-2026-0149 — the same lines, the same costs, the same margins. Nothing was re-keyed to get there.

Note: Group spares stock-up. Drillit hold these for field service.

Total ex GST

$144,980

$14,498.00 GST · $159,478.00 inc

Cost to build

$79,094

Rolled up from the BOMs

Margin

45.4%

$65,886

Lead time quoted

6 wks

Delivery 15 Sep 2026

Lines

Cost per line is the multi-level roll-up, not a percentage guess. Open a part number to see what it's made of.

#Part No.DescriptionQtyUnit ex GSTLine ex GSTCostMarginFree stock
1 GBX-THD-1000 THD Gearbox — 1000 series — 1000 series gearbox, sold as a spare 2 $34,000.00 $68,000.00 $36,780 45.9% 0
2 GBX-THD-500 THD Gearbox — 500 series — 500 series gearbox, sold as a spare 2 $20,000.00 $40,000.00 $21,851 45.4% 1
3 BD-PMP-SVC-KIT Pump Spares & Service Kit — Liners, pistons, valves and seats — duplex 350 4 $3,305.00 $13,220.00 $7,400 44.0% 2
4 ACC-SUB-API-114 Substitute, API Reg 114 mm — Crossover sub, box × pin, heat treated 4140 12 $1,980.00 $23,760.00 $13,063 45.0% 8
Total ex GST $144,980.00 $79,094 45.4%
GST 10% $14,498.00
Total inc GST $159,478.00