Levels
1
4 exploded lines
Material
$4,393
4 leaf lines
Labour
$17,464
148 h at $118.00
Standard cost
$21,857
Rolled up, never typed
Not sold on its own
—
Component of a larger build
2 lines in this structure are below their reorder point
RAW-SHS-200X200X10, CON-WIRE-FCAW . The requirements run will tell you which of those actually have to be ordered this week.
Multi-level explosion
Quantity per parent, quantity for one Chassis Frame — 1000 class, welded, and the cost each level carries.
Make Buy Subcontract
| Lvl | Part No. | Description | Qty / parent | Qty / unit | UoM | Source | Supplier / work centre | Unit cost | Extended | Free |
|---|---|---|---|---|---|---|---|---|---|---|
| 0 | FAB-CHS-FRAME-1000 | Chassis Frame — 1000 class, welded | 1 | 1 | ea | Make | Robotic Weld Cell | $21,857 | $21,857 | 0 |
| 1 | RAW-PL-350-20 | Plate 20 mm Grade 350 | 420 | 420 | kg | Buy | InfraBuild Steel Centre | $2 | $987 | 7,920 |
| 1 | RAW-SHS-200X200X10 | SHS 200 × 200 × 10 Grade 350 | 9.8 | 9.8 | m | Buy | InfraBuild Steel Centre | $172 | $1,686 | 17 |
| 1 | CON-WIRE-FCAW | Flux-Cored Wire 1.6 mm | 22 | 22 | kg | Buy | Cigweld | $16 | $361 | 84 |
| 1 | SUB-LASER-PL | Laser Profiling — plate nest | 2 | 2 | ea | Subcontract | Laser Cutting Services QLD | $680 | $1,360 | 0 |
Where the material money goes
Bought and subcontracted content only — $3,033.40 bought, $1,360.00 outside operations.
| Part No. | Description | Supplier | Qty | Unit | Extended | Share |
|---|---|---|---|---|---|---|
| RAW-SHS-200X200X10 | SHS 200 × 200 × 10 Grade 350 | InfraBuild Steel Centre | 9.8 m | $172 | $1,686 | 38.4% |
| SUB-LASER-PL | Laser Profiling — plate nest | Laser Cutting Services QLD | 2 ea | $680 | $1,360 | 31.0% |
| RAW-PL-350-20 | Plate 20 mm Grade 350 | InfraBuild Steel Centre | 420 kg | $2 | $987 | 22.5% |
| CON-WIRE-FCAW | Flux-Cored Wire 1.6 mm | Cigweld | 22 kg | $16 | $361 | 8.2% |
Where used
This part goes into 1 other structure.
Jobs building this
Nothing on the floor for this part right now.