← Inventory
RAW-SHS-200X200X10
Buy Below reorder pointSHS 200 × 200 × 10 Grade 350
Raw material · supplied by InfraBuild Steel Centre
On hand
46m
YARD 3 · Archerfield Main Store
Allocated
29
Committed to jobs
Free
17
Reorder point 60
On order
0
21-day lead
Turns
6.5
300 m a year
Value held
$7,912
$172.00 each
Raise now
Needed 4 Aug 2026, and the 21-day lead means it should already have left — expedite by 21 days
Driven by (make FAB-CHS-FRAME-1000) (49 m by 4 Aug 2026), (make FAB-CHS-FRAME-500) (50.4 m by 4 Aug 2026) .
Stock movements
Newest first. The balance on the top row is the on-hand figure above — the ledger and the position can't disagree, because one is derived from the other.
| Date | Type | Reference | By | Qty | Balance |
|---|---|---|---|---|---|
| Tue 4 Aug | Issue to WO | WO-2026-0440 | JF | -3.92 | 46 |
Costing
- Bought cost
- $172.00
- Standard cost
- $172.00
- Lead time
- 21 days
Where used
Goes into 4 structures.