Levels
1
4 exploded lines
Material
$3,502
4 leaf lines
Labour
$12,272
104 h at $118.00
Standard cost
$15,774
Rolled up, never typed
Not sold on its own
—
Component of a larger build
2 lines in this structure are below their reorder point
RAW-SHS-200X200X10, CON-WIRE-FCAW . The requirements run will tell you which of those actually have to be ordered this week.
Multi-level explosion
Quantity per parent, quantity for one Chassis Frame — 500 class, welded, and the cost each level carries.
Make Buy Subcontract
| Lvl | Part No. | Description | Qty / parent | Qty / unit | UoM | Source | Supplier / work centre | Unit cost | Extended | Free |
|---|---|---|---|---|---|---|---|---|---|---|
| 0 | FAB-CHS-FRAME-500 | Chassis Frame — 500 class, welded | 1 | 1 | ea | Make | Robotic Weld Cell | $15,774 | $15,774 | 0 |
| 1 | RAW-PL-350-20 | Plate 20 mm Grade 350 | 280 | 280 | kg | Buy | InfraBuild Steel Centre | $2 | $658 | 7,920 |
| 1 | RAW-SHS-200X200X10 | SHS 200 × 200 × 10 Grade 350 | 7.2 | 7.2 | m | Buy | InfraBuild Steel Centre | $172 | $1,238 | 17 |
| 1 | CON-WIRE-FCAW | Flux-Cored Wire 1.6 mm | 15 | 15 | kg | Buy | Cigweld | $16 | $246 | 84 |
| 1 | SUB-LASER-PL | Laser Profiling — plate nest | 2 | 2 | ea | Subcontract | Laser Cutting Services QLD | $680 | $1,360 | 0 |
Where the material money goes
Bought and subcontracted content only — $2,142.40 bought, $1,360.00 outside operations.
| Part No. | Description | Supplier | Qty | Unit | Extended | Share |
|---|---|---|---|---|---|---|
| SUB-LASER-PL | Laser Profiling — plate nest | Laser Cutting Services QLD | 2 ea | $680 | $1,360 | 38.8% |
| RAW-SHS-200X200X10 | SHS 200 × 200 × 10 Grade 350 | InfraBuild Steel Centre | 7.2 m | $172 | $1,238 | 35.4% |
| RAW-PL-350-20 | Plate 20 mm Grade 350 | InfraBuild Steel Centre | 280 kg | $2 | $658 | 18.8% |
| CON-WIRE-FCAW | Flux-Cored Wire 1.6 mm | Cigweld | 15 kg | $16 | $246 | 7.0% |
Where used
This part goes into 1 other structure.
Jobs building this
Nothing on the floor for this part right now.